Skip to content

docs(program): add release-completion vision and program map - #29

Draft
drewstone wants to merge 1 commit into
mainfrom
factory/release-completion
Draft

docs(program): add release-completion vision and program map#29
drewstone wants to merge 1 commit into
mainfrom
factory/release-completion

Conversation

@drewstone

Copy link
Copy Markdown
Contributor

Braid release-completion program map

Reconstruction notice. This map was reconstructed by the N1 seeding arm from README.md,
docs/08-verification.md, and docs/09-delivery-plan.md evidence, because the round-1
original program documents were not handed to this arm. Completion authority remains
docs/08-verification.md and docs/09-delivery-plan.md (AGENTS.md:71); priorities are
defined in braid-VISION.md.

Verified baseline: tangle-network/braid main 3d7b79f = tag v0.1.3 = npm 0.1.3;
warmup PR pipeline proven on agent-knowledge#140: PR #142 merged.

Nodes

Node Arm Mandate VISION priorities
N1 This arm (seed factory/release-completion) Seed the integration branch from the pinned base 3d7b79f, reconstruct and commit the program documents (docs/program/), and open the standing draft PR. P4+P1
N2 Live-matrix arm Close LIVE-01LIVE-12 with real-provider records and confirmed cleanup: strict bridge gate pnpm test:live:bridge:release (LIVE-01LIVE-05), Tangle inference/sandbox/interaction/fork/confidential rows, supervisor, and agent-eval analysis; run the retained-sandbox canary-plus-cohort; resolve or honestly route the CLI Bridge issue 130 aggregate-run blocker (docs/08-verification.md:360-425, :383-413, :423, :479-492). P2
N3 Measurement arm Land the full PERF-01PERF-10 distributions (W12) and the calibrated EVAL-01EVAL-06 judge records (11-of-12 calibration, trivial baselines rejected) so VR-03/VR-07/VR-09 hold for the exact build (docs/08-verification.md:318-350, :516-547, :600-611, :740). P3
N4 Publication arm Execute W13 on the frozen main commit: pnpm check, pnpm release:prepare, isolated code-free Ed25519 endorsement, npm publish with provenance, registry smoke on Linux x64 and macOS arm64, publication record, tag (docs/09-delivery-plan.md:396-428; docs/08-verification.md:352-358, :627-639, :694-696). P5
N5 Audit-close arm Assemble the comprehensive audit on demand (not an npm prerequisite), confirm zero unresolved externally billable live resources, and walk the final definition of done (docs/08-verification.md:615-720; docs/09-delivery-plan.md:489-505). P6
Final swe-final-integration-pr Flip the N1 draft PR to ready and merge it into main once N2–N5 land. The draft stays draft until this node. P4

Rules

  • The base is pinned at the charter sha 3d7b79f; every arm rebases cleanly on origin/main
    before landing (freeze only after all feature changes merge, docs/09-delivery-plan.md:467).
  • Every arm keeps pnpm check green on the branch (README.md:296-316).
  • An unavailable required live provider blocks the release and is reported unavailable — never
    skipped or simulated (docs/08-verification.md:381).
  • No requirement identifier is marked complete without exact-build evidence
    (docs/08-verification.md:789, VR-01).

Reconstruct the round-1 program documents from committed repository evidence
because the round-1 originals were not handed to this arm.

The VISION draws on: docs/08-verification.md (completion rule; required
live matrix LIVE-01..LIVE-12; sandbox durability stress; current
core-path observations including the CLI Bridge issue 130 aggregate-run
blocker; performance targets PERF-01..PERF-10; Layer 8 semantic
evaluation and EVAL-01..EVAL-06; Layer 9 installation and release
checks; comprehensive audit manifest and publication direct acceptance
path; verification acceptance VR-01..VR-10) and docs/09-delivery-plan.md
(outcome; W5 delivery; W13 publication; requirement ownership; upstream
pull-request and release order; rollback and failure policy; final
definition of done), plus README.md (install and supported targets,
retained production cohort evidence, development and proof commands).

The program map records the verified baseline (main 3d7b79f = tag
v0.1.3 = npm 0.1.3; warmup PR pipeline proven on agent-knowledge#140:
PR #142 merged), node N1 = this seeding arm, the subsequent arms the
docs/08+09 evidence supports, and the final swe-final-integration-pr
node that flips this draft PR to ready.
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant